Contact Us
Email:info@verypixel.com
Tel:+86-755-27499006
Fax:+86-755-29923911 Learn More
 

How to install LED display?

How to install LED Display? What is the mainly attention that I must pay during the installment of LED Display? A lot of customers often asked the above questions before they purchase the LED Display. Combined with VERYPIXEL latest LED display installment onsite pictures, we give a fully detailed analysis of the process of pole-hold LED display installment on below. So you can get a preliminary & intuitive understanding of the process.

When we have decided to purchase a LED display, fist is to confirm the install location and the Size. After that, the most important thing we must confirm is the method of LED display installation and steel structure. Installation methods of LED display mainly include Pole-hold, embedded, wall-mounted, hanging, pedestal and so on.

We must investigate the location, and the circumstance of the LED display, then to confirm the most appropriate method of the LED Display installment. If you have doubt of this processing, you can seek Verypixel's structure engineer’s help.

To consider the structure of LED Display, we need to analyze the following factors to determine the maximum cost-effective:

First, confirm the appropriate LED Installment method

Second, confirm the steel structure according to LED screen weight and installation height.

To design the steel Frame, we must also consider the local wind-resistance, geological factors. For the outdoor LED Display, we must consider waterproof, lightning protection and cooling system.

When we get the relevant drawing and LED display shipped to the installment site, we must carry out the construction of LED display structure and LED display installed. The following is the most conventional pole-hold LED display installation instructions.

First, do the infrastructure work----digging, installation base, reinforcement of concrete base according the initial drawing of the installment.

 

 

Second, fix pole installation.

 

 

Third, assemble the steel framework of LED display

Forth, use the crane to lift the steel framework to be fixed on the Pole

 

 

That's all, we completed the LED display main structural components installment work.

Then we just start the LED Display Cabinet installment, connection, and setup.

First of all, fix the LED Display Cabinet on the Framework

Second, do power & signal cable connection according to the connection diagram.

Third, connect the LED display to main input power feed, connect computer and sending the card, and power on and start setup.

Then, adjust the gray, refresh rate, and other optimization setup according to the status of LED display.

 

 

LED display installation has been basically completed when you finished the above of the work. And then we have to install the outer Frame and other ancillary parts such as lightning, CCTV, audio installation and etc.. We must follow-up LED display on routine maintenance and repair to make the LED display to achieve the best performance.

 



 

E-mail:info@verypixel.com  MSN:info@verypixel.com  Skype:verypixel  2007-2018 Verypixel. All Rights Reserved Sitemap